Preserving with SieStar at Camping Olmenveld - Made in NL -

Preserving with SieStar at Camping Olmenveld - Made in NL -

SieStar - Made in Holland - - design and production of LFP battery modules - design and production of the battery energy storage system - development and management of the EMS - 24/7 support from our HQ in Terneuzen. 15+ years expertise

Preserving with SieStar at Camping Olmenveld - Made in NL -

SieStar slim batterij energieopslag systeem C10

SieStar smart battery energy storage system C10

The SieStar C10 battery energy storage system (430 kWh/187.5 kW) installed and commissioned at Serooskerke.

The integrated SieStar EMS provides at this location the possibilities to optimise energy consumption from the grid.

The integrated SieStar Energy Management System provides at Camping Olmenveld:

  • Peakshaving; to avoid exceeding Contracted Transmission Capacity (GTV)
  • Load shifting; Saving the generated solar energy for own consumption at a later point in time

Unique:

Off-season, this C10 is controlled directly from Edmij.

Without additional black boxes to be purchased – and additional subscription costs - the SieStar responds directly and accurately to the control command from aggregator Edmij to generate returns on the imbalance market.

 

Andere nieuwsberichten

SieStar – Increases infrastructure availability within Contracted Transport Capacity  (CTC)

SieStar – Increases infrastructure availability within Contracted Transport Capacity (CTC)

28 juli 2025

At H4A in Sas van Gent (NL) increased degree of electrification leads in winter frequently to exceeding CTC, despite a partial shutdown of charging infrastructure. What now?

Read more
SieStar: Energy Storage that Powers Your Business Growth

SieStar: Energy Storage that Powers Your Business Growth

30 mei 2025

FMI Precision in Bergen op Zoom has a smaller Contracted Grid Capacity and no gas at the new location. Now what?

Read more
SieStar - the stationary smart battery solutions - meet the requirements of the SPRILA grant!

SieStar - the stationary smart battery solutions - meet the requirements of the SPRILA grant!

10 maart 2025

SPriLA grant applications are possible from 26 March 2025 When fast charging and/or simultaneous charging of multiple electric vehicles, as an SME or large enterprise you run into the limited grid connection or Contracted Transmission Capacity

Read more